RATINGS:
·          each risks severity on scale from Negligable1 (N), Low risk (L), Moderate risk (M), Severe (S), Very severe (V)
·          each risks likelihood on scale from Very unlikely (VU), Unlikely (U), Possible (P), Likely (L), Very likely (VL)
·         risk factor from the table overleaf.

Hazard

Present?

Severity
Likelihood
Risk Factor
1
Alcohol/drugs
n
L
VU
3
2
Animals/insects
n
L
VU
3
3
Audiences
n
L
VU
3
4
Camera cable/grip equipment
N
L
VU
3
5
Confined spaces
n
L
VU
3
6
Derelict buildings/dangerous structures
n
L
VU
3
7
Electricity/gas (other than normal supplies)
n
L
VU
3
8
Fatigue/long hours
y
M
VU
3
9
Fire/flammable materials
n
L
VU
3
10
Hazardous substances
n
L
VU
3
11
Heat/Cold/extreme weather
n
L
VU
3
12
Laser/strobe effects
n
L
VU
3
13
Machinery/industrial/ crane/hoist
N
L
VU
3
14
Materials - glass, non-fire retardant set materials
n
L
VU
3
15
Night operation
n
L
VU
3
16
Noise – high sound levels
n
L
VU
3
17
Non standard manual handling
n
L
VU
3
18
Public/crowds
n
L
VU
3
19
Radiation
n
L
VU
3
20
Scaffold/Rostra
n
L
VU
3
21
Smoking on set
n
L
VU
3
22
Special effects/explosives
n
L
VU
3
23
Special needs (elderly, disabled, inexperienced)
n
L
VU
3
24
Specialised rescue/first aid
n
L
VU
3
25
Stunts, dangerous activities
n
L
VU
3
26
Tall scenery/suspended ceilings
n
L
VU
3
27
Vehicles/speed
n
L
VU
3
28
Water/proximity to water
n
L
VU
3
29
Weapons
n
L
VU
3
30
Working at heights
n
L
VU
3
31
Working overseas
n
L
VU
3
32
Other risks
n
L
VU
3

Calculate the Risk Factor:

Very Unlikely

Unlikely
Possible
Likely
Very Likely
Very severe
3
4
4
5
5
Severe
2
3
3
3
5
Moderate
2
2
3
3
3
Low
1
2
2
3
3
Negligible
1
1
2
2
3

Decide the action to take:
5
Very severe
Take immediate action
4
Severe
High priority
3
Moderate Risk
Programme for action
2
Low Risk
Action may be required
1
Negligible
Probably acceptable

Then list each risk identified

Hazard no: 8

Risk Factor (1-5):
1
Description

Fatigue/long hours – there is going to be unforeseen changes.
Person(s) exposed (detail if cast/crew (C), outside company (O) or public (P) )
Cast/crew
Action to take
Ensure that we stick to the storyboard and timings.
Person/company responsible for action
producer
To be completed at agreed later date
Exposed person(s) informed? (y/n)
y
Agreed action taken? (y/n)
y
Risk removed? (y/n)
Y







Completed by:  SARAH                                                   Position: MAIN ACTOR

Signature          SARAH                                                   Date: 05/10/2015


No comments:

Post a Comment