RISK ASSESSMENT FORM
|
|||||||||
Shoot
date
17/10/15 |
Production Title
|
Producer
|
Location: Edmonton
|
|||
Address: Streamside Cl, London, England N9 |
RATINGS:
·
each
risks severity on scale from Negligable1 (N), Low risk (L), Moderate risk (M),
Severe (S), Very severe (V)
·
each
risks likelihood on scale from Very unlikely (VU),
Unlikely (U), Possible (P), Likely (L), Very likely (VL)
·
risk factor from the table overleaf.
Hazard
|
Present?
|
Severity
|
Likelihood
|
Risk Factor
|
|
1
|
Alcohol/drugs
|
n
|
L
|
VU
|
3
|
2
|
Animals/insects
|
n
|
L
|
VU
|
3
|
3
|
Audiences
|
n
|
L
|
VU
|
3
|
4
|
Camera
cable/grip equipment
|
N
|
L
|
VU
|
3
|
5
|
Confined
spaces
|
n
|
L
|
VU
|
3
|
6
|
Derelict
buildings/dangerous structures
|
n
|
L
|
VU
|
3
|
7
|
Electricity/gas
(other than normal supplies)
|
n
|
L
|
VU
|
3
|
8
|
Fatigue/long
hours
|
y
|
M
|
VU
|
3
|
9
|
Fire/flammable
materials
|
n
|
L
|
VU
|
3
|
10
|
Hazardous
substances
|
n
|
L
|
VU
|
3
|
11
|
Heat/Cold/extreme
weather
|
n
|
L
|
VU
|
3
|
12
|
Laser/strobe
effects
|
n
|
L
|
VU
|
3
|
13
|
Machinery/industrial/
crane/hoist
|
N
|
L
|
VU
|
3
|
14
|
Materials
- glass, non-fire retardant set materials
|
n
|
L
|
VU
|
3
|
15
|
Night
operation
|
n
|
L
|
VU
|
3
|
16
|
Noise
– high sound levels
|
n
|
L
|
VU
|
3
|
17
|
Non
standard manual handling
|
n
|
L
|
VU
|
3
|
18
|
Public/crowds
|
n
|
L
|
VU
|
3
|
19
|
Radiation
|
n
|
L
|
VU
|
3
|
20
|
Scaffold/Rostra
|
n
|
L
|
VU
|
3
|
21
|
Smoking
on set
|
n
|
L
|
VU
|
3
|
22
|
Special
effects/explosives
|
n
|
L
|
VU
|
3
|
23
|
Special
needs (elderly, disabled, inexperienced)
|
n
|
L
|
VU
|
3
|
24
|
Specialised
rescue/first aid
|
n
|
L
|
VU
|
3
|
25
|
Stunts,
dangerous activities
|
n
|
L
|
VU
|
3
|
26
|
Tall
scenery/suspended ceilings
|
n
|
L
|
VU
|
3
|
27
|
Vehicles/speed
|
n
|
L
|
VU
|
3
|
28
|
Water/proximity
to water
|
n
|
L
|
VU
|
3
|
29
|
Weapons
|
n
|
L
|
VU
|
3
|
30
|
Working
at heights
|
n
|
L
|
VU
|
3
|
31
|
Working
overseas
|
n
|
L
|
VU
|
3
|
32
|
Other risks
|
n
|
L
|
VU
|
3
|
Calculate
the Risk Factor:
Very Unlikely
|
Unlikely
|
Possible
|
Likely
|
Very
Likely
|
|
Very
severe
|
3
|
4
|
4
|
5
|
5
|
Severe
|
2
|
3
|
3
|
3
|
5
|
Moderate
|
2
|
2
|
3
|
3
|
3
|
Low
|
1
|
2
|
2
|
3
|
3
|
Negligible
|
1
|
1
|
2
|
2
|
3
|
Decide
the action to take:
5
|
Very
severe
|
Take
immediate action
|
4
|
Severe
|
High
priority
|
3
|
Moderate
Risk
|
Programme
for action
|
2
|
Low
Risk
|
Action
may be required
|
1
|
Negligible
|
Probably
acceptable
|
Then list each risk identified
Hazard no: 8
|
Risk Factor (1-5):
|
1
|
|||||
Description
|
Fatigue/long hours – there is going
to be unforeseen changes.
|
||||||
Person(s) exposed (detail if
cast/crew (C), outside company (O) or public (P) )
|
Cast/crew
|
||||||
Action to take
|
Ensure that we stick to the storyboard and timings.
|
||||||
Person/company responsible for action
|
producer
|
||||||
To be completed at agreed
later date
|
|||||||
Exposed person(s) informed? (y/n)
|
y
|
Agreed action taken? (y/n)
|
y
|
Risk removed? (y/n)
|
Y
|
||
Completed by: SARAH Position: MAIN ACTOR
Signature SARAH Date:
05/10/2015
No comments:
Post a Comment