Saturday, 24 October 2015

Filming Day Four

Today was our fourth day of filming. We filmed the car scene which was in Edmonton using the actors dads car. It was difficult to film the birds eye view of the car driving as the window in the flat was not high enough, however, we tried our best to make it look like it is a birds eye view shot. We didn't check the weather as we did not need to as the scene was filmed inside the car so it didn't matter if it rained, which it did but was not a problem. We had our storyboards with us and we ensured that we stuck to our storyboards strictly and precisely to ensure that everything was filmed to a high standard and as a result, we did not take very long to film. We all had team roles (listed in a post below) in which we all stuck to. Overall, I would say that it was a very productive day of filming, we are hoping to film more footage soon.









Thursday, 22 October 2015

Equipment form/booking form two

                       

Above is an attached picture of the booking form of me and my group signing to borrow the DSLR camera and tripod. We are prepared to shoot the car scene on Saturday 24th October. 

Editing Day Two

                      

Today we uploaded the footage from yesterday. We decided to name all the files by location so that it is easier to find the clips. We realised that we forgot to convert the files so we converted the files so that the files aren't too big. 

Wednesday, 21 October 2015

Filming Day Three

Today was our third day of filming. We used the photography studio to film the studio scene. As the photography studio had a black backdrop we couldn't film the silhouette shots which was unfortunate. We used the flasheads to suit our preference of lighting. After a while, we had to leave the photography studio as other students booked it so we didn't finish all our shots, however, we decided to finish off the shots that were left in the TV studio. In the TV studio, there was a projector and a laptop, we came up with the idea of using the projector to show a nice colourful backdrop from the internet to compliment Sarah's (main actor) outfit instead of the silhouette shots. We all had team roles (listed in a post below) in which we all stuck to.We had our storyboards with us so that we knew exactly what we were doing which allowed us to finish filming quickly as we knew exactly what we were doing. Overall, I would say that it was a very productive day, even though we had problems, we used our initiative and improvised to resolve the issues and as a result, came up with a better resolution than what was actually planned. We are hoping to film more footage soon.








Tuesday, 20 October 2015

Editing Day One

                                                

Since we weren't planning on filming today, we decided to go to the editing suite. We uploaded all our footage from the memory card from the camera onto the Macs and made a folder and saved all the files on the folder and then uploaded the files on Final Cut Pro. We dragged all the files onto the sidebar on Final Cut Pro.We looked over our footage. We also downloaded our song, Jealous Type, on the Mac. We are hoping to start editing properly next media lesson. 

Call sheet (Filming Day Three)