Today was our third day of filming. We used the photography studio to film the studio scene. As the photography studio had a black backdrop we couldn't film the silhouette shots which was unfortunate. We used the flasheads to suit our preference of lighting. After a while, we had to leave the photography studio as other students booked it so we didn't finish all our shots, however, we decided to finish off the shots that were left in the TV studio. In the TV studio, there was a projector and a laptop, we came up with the idea of using the projector to show a nice colourful backdrop from the internet to compliment Sarah's (main actor) outfit instead of the silhouette shots. We all had team roles (listed in a post below) in which we all stuck to.We had our storyboards with us so that we knew exactly what we were doing which allowed us to finish filming quickly as we knew exactly what we were doing. Overall, I would say that it was a very productive day, even though we had problems, we used our initiative and improvised to resolve the issues and as a result, came up with a better resolution than what was actually planned. We are hoping to film more footage soon.
Wednesday, 21 October 2015
Tuesday, 20 October 2015
Editing Day One
Since we weren't planning on filming today, we decided to go to the editing suite. We uploaded all our footage from the memory card from the camera onto the Macs and made a folder and saved all the files on the folder and then uploaded the files on Final Cut Pro. We dragged all the files onto the sidebar on Final Cut Pro.We looked over our footage. We also downloaded our song, Jealous Type, on the Mac. We are hoping to start editing properly next media lesson.
Monday, 19 October 2015
Filming Day Two
Today was our second day of filming. We filmed the Olympic Park scene and a few other scenes. Before making our way to Olympic Park, me and my group went to a firework shop to buy sparklers to use for the Olympic Park scene (last scene) and then we travelled to our location. Before leaving for our location, we checked the weather to see whether it would rain, we were pleased to see that it wouldn't be and this was the case. The lighting of the location was not as bad as Saturday which was an advantage as we want to get the lighting of our video perfect. We decided to film near the trees as the scenery looked nice. We had problems with lighting the sparklers due to it being very windy in the location however, after several times of trying to light them up we finally got them working. We lit them at the perfect time as it was becoming dark which meant that the sparklers would show up on the cameras much more nicer and brighter. We also decided to film the sparklers bit behind a stone background in the park and under a bridge to give our music video an urban feel to it and also we wanted the area to be isolated so that all the focus can be on the actor and the sparklers. We all had team roles (listed in a post below) in which we all stuck to.We had our storyboards with us so that we knew exactly what we were doing which allowed us to finish filming quickly as we knew exactly what we were doing.Overall, I would say that this was another productive day of filming as we quickly got the swing of things as we had already filmed for a whole day on Saturday and also got a lot of filming done. We are hoping to film more footage soon. Here are some attached pictures of the day taken by our phones:
Sunday, 18 October 2015
Call Sheet (Filming Day Two)
We decided not to use Hyde Park as a location instead we will be using Olympic Park. We decided not to use Hyde Park as it is far and time is limited and also, there is not much scenery just a lot of greenery. So instead of using Hyde Park, we decided to use Olympic Park as it is local and has a lot of nice scenery which is what we wanted. Here is the call sheet:
Saturday, 17 October 2015
Filming Day One
Today was our first day of filming. We shot Sarah's scenes where she is the only actor in the scenes. We checked the weather beforehand, and was pleased to see that it would not be raining, which was accurate.We all met at a specific time at a specific place and then we went off to our chosen locations. The locations for today were Oxford street, Jubilee Bridge and One new change, The Roof Terrace. We had our storyboards with us and we ensured that we stuck to our storyboards strictly and precisely to ensure that everything was filmed to a high standard. The lighting of the locations were a bit dark and dull because it was really cloudy which was unfortunate, however, we adjusted the settings to suit our preference. We all had team roles (listed in a post below) in which we all stuck to. Overall, I would say it was a very productive day of filming. We are hoping to do more filming next week. Here are the pictures taken by our phones showing me and my group in action and also the locations.
Subscribe to:
Posts (Atom)


























